Under Slab Insulation – Day 2

I was very sore from all the work on day 1 – so not nearly as much got done on day 2.  I was able to complete taping all the seams on the first layer and started laying the second layer of insulation:

I got maybe 25% of the way done laying the second layer, but got most of the fiddly stuff out of the way like around the sump pump pit and radon ventilation pipe.

After a liberal application of Icy-Hot ™ I feel day 3 will be more productive!