Monthly Archives: September 2015

More progress being made

Today we decided to figure out how the solar racks are assembled – there is an assembly manual provided but it wasn’t as clear as we’d hoped.  We got out there first thing this morning before it got too hot, and managed to get one of the racks partially assembled, and figured out where the rest of the pieces go.

Partly assembled solar rack
Partly assembled solar rack

After that, we put the platform back into the stairwell so dad could continue mudding and taping the drywall, and I went outside to work on creating a level base for our front stairs.  When I originally built the stairs last year it was a bit of a rush job just to get something there, so I needed to dig out the sand and create a good gravel base before we start building any railings.

Mudding and taping progress in the stairwell
Mudding and taping progress in the stairwell
Adding gravel for a level base
Adding gravel for a level base
Working hard, hardly working...
Working hard, hardly working…

Tomorrow, we hope to get a few last things wrapped up for our gas inspection (scheduled for Saturday), and then finish off the mudding in the stairwell so we can continue bringing the drywall down the left-hand side of the stairs down into the basement.

Getting stuff done

Yesterday and today dad and I worked on a number of things.  We finished drywalling in the majority of the stairwell and even started mudding some of that.

All we have left is a couple pieces down the left hand side, and to install a handrail for safety.

We also got both of the 50′ lengths of strut drilled and installed for the solar racking, so as soon as the last of the fittings arrive at the supplier we can start setting that up.

Lastly, we started closing in the porch with a couple of sheets of OSB so that we can continue our siding all the way around the porch.

Closing in the porch for the siding
Closing in the porch for the siding

Tomorrow we will probably start preparing to build out handrails for the porch stairs and try to finish off the drywalling in the stairwell.

Hope you enjoyed the pictures, stay tuned for more updates!

More solar rack preparation

Today dad and I went out again to work on the solar racking – in the morning before it got so darn hot.  We managed to get the holes drilled and one of the two 50′ lengths of strut installed on the threaded rod we installed yesterday, by the time we were done it was blazing hot, so we decided to do the second 50′ length tomorrow morning (weather permitting, as it seems the rain is rolling in).

After that, we decided to move indoors and start running the interior wiring for our satellite tv and networking, just to get out of the sun.  We drilled in to the basement, under the front porch, and ran new lines from the satellite dish to the area our video and networking hub will be located, and also ran a new line for our cell phone signal booster through the attic and down to the same area.  We just need to run a final wire in from our satellite internet dish, and the cables for our networking, and that will be that.

One other thing we got sorted out yesterday was the plumbing for our dishwasher – we finally got the necessary parts for the drain to get connected and so we were able to give it a test run at long last.  It seems to work well and is super quiet!

Hope you enjoyed the pictures and I’m sure we’ll have more for you in the next day or so!

More help on the house

We have a new helper up here at the ranch, my Dad came up from Florida to give us a hand making the final push for our occupancy permit.  We are of course happy to get the extra help!

We first tackled some more work on getting the solar racking set up – we used my hammer drill to make 1/2″ diameter holes, about six inches down into each block.  We cleaned all the concrete dust out the holes using the compressor, and then epoxied in some 7/16″ threaded rod into each hole, leaving a couple inches exposed.

You can see we also got the aluminium strut here now to mount the solar racks on.  These come in 10′ lengths, and we have some channel joiners to connect them together to create two seamless 50′ lengths across all the concrete ballast blocks.

We also got the last few boards installed into the porch ceiling and it’s great to finally have that job completed!

Unfortunately we didn’t get any pictures, but we also spent an inordinate amount of time moving the satellite dish for our TV service, from where I had temporarily mounted it on the ground, up to the side of the house below where our internet satellite dish is mounted.

More to come in the next few days as we continue to cross things off the list!

 

More siding (rear wall)!

We are just continuing on with the siding up here, and instead of doing the second course on the west wall, we moved to the back wall to square that away.

Here’s a few more pictures of where we are at right now.

We expect to finish off the back wall perhaps by tomorrow, and then we will work our way across the east wall.  Once we are done the first course of siding all the way around, we’ll start the second courses on the east and west walls.

We’ll be sure to keep you posted, thanks for reading and hope you enjoyed the pictures!